Solicitation Documents

 
System Protection Engineering Services

Collective 7000155344

Description: Company shall perform an independent peer review of CPS Energy’s system protection design process and protective relaying settings documentation related to the relaying mis-operation that occurred on June 26, 2019 at the C4 Kirby substation.

Solicitation Detail:

Company to provide an independent engineering review, analysis and shall provide recommendations to CPS Energy to improve the system protection design process, system protection standard operating procedures, the deployment process of relay settings, and the commissioning process of relay settings to minimize the potential for errors that could lead to relaying mis-operations.   

Solicitation Documents:

Companies wishing to provide a Response for this Solicitation must download the Collective Document for this Solicitation no later than September 24, 2019 from the website. There is a link for the Collective Document located on the left side of this page, under the “Solicitation Documents.” To successfully download the documents, it is recommended that Google Chrome 33+, Mozilla Firefox 38.01.1, or Internet Explorer 9 or greater be used.

Pre-Solicitation Meeting:

There will be no Pre-Solicitation Meeting.

Response Due Date:

Responses are due no later than September 25, 2019 at 3:00 p.m. (Central). CPS Energy reserves the right to reject late Submittals. The Collective Document contains all pertinent information regarding Responses.

Contact Name: BonnieSue Bray

Contact Email: bsbray@cpsenergy.com