Please note: Our customer service centers are not taking credit cards payments at this time.
To make a payment, you can access Manage My Account or these other Payment Options.

Hunt Lane to Pinn Road Transmission Line Rebuild Project

 

CPS Energy is planning to rebuild an existing double circuit 138 kV transmission line between the Hunt Lane and Pinn Road substations. The transmission line route will be approximately four miles long and begins near the existing Hunt Lane Substation near the intersection of Marbach Road and Hunt Lane.

The project will involve a complete rebuild of the transmission line including foundations, transmission structures (poles) and electrical wires.  CPS Energy plans to replace the transmission line along the existing route. However, there will be a change in the type of structures. The existing lattice (webbed) structures will be replaced with steel poles.

The project is scheduled for completion in June 2017.

For more information, contact:

CPS Energy
Kevin Phillips, Project Manager
Hunt Lane to Pinn Rd. Transmission Line Rebuild Project
Mail Code 111008
P.O. Box 1771
San Antonio, Texas 78296-1771
(210) 353-2923