We stand ready to help any customer in need. Our People First philosophy led us to suspend disconnects while our community bands together during this challenging time. If you are experiencing financial hardship, we urge you to contact us for help. Call us at 210-353-2222 or online at cpsenergy.com/assistance.

We require the use of a face-covering and we will screen customers for COVID-19 symptoms before they enter any CPS Energy facility. Our modified customer service center hours are 10:30 am to 5:00 pm. Monday-Friday. If you have tested positive, or a family member has tested positive for COVID-19 in the last 14 days, please use our online tools or call 210-353-2222 for assistance.  Please do not visit our customer service center if you have COVID-19 symptoms.

Five Points to Westside Transmission Line Rebuild Project

 

CPS Energy is planning to rebuild an existing single circuit 138 kV transmission line between the Westside and Five Points substations. The transmission line route will be approximately four miles long and begins near at the Westside Substation near the intersection of Ruiz St and San Joaquin Ave. The project will involve a complete rebuild of the transmission line including foundations, transmission structures (poles) and electrical wires. CPS Energy plans to replace the transmission line along the existing route.  However, there will be a change in the type of structures. The existing lattice (webbed) structures will be replaced with steel poles.

The project is scheduled for completion in June 2017.

 For more information, contact:

CPS Energy
Kevin Phillips, Project Manager
Five Points to Westside Transmission Line Rebuild Project
Mail Code 111008
P.O. Box 1771
San Antonio, Texas 78296-1771
(210) 353-2923
ktphillips@cpsenergy.com